
Solid
One colour, high gloss or satin. Clean and modern.
02 — Epoxy
Seamless flake and solid resin floors, roofs and balconies. Tough, easy to clean, and a joy to watch go down.
What it is
Epoxy is a two-part resin that bonds into concrete and cures into one hard, seamless surface. It resists oil, water and most chemicals, and it is easy to keep clean.
The coating is only as good as the slab under it. We diamond-grind, repair cracks and moisture-test before any resin goes down. On roofs and balconies we screed to falls so water runs to the drain, then finish with a UV-stable topcoat.
Anatomy of the finish
Where it works
A bright floor that resists oil and tyre marks.
Screeded to falls, sealed against water and sun.
Hard-wearing floors for busy work areas.
Seamless, easy-to-clean floors for retail and food areas.
Finishes
Photographic finish references from All Purpose Coatings. Our own site work follows below.

One colour, high gloss or satin. Clean and modern.

Broadcast flakes hide dust and add grip and texture.

Coloured quartz for heavy traffic and slip resistance.

Pigments that move and pool for a liquid, marbled look.
On the tools

Our process
We read the surface before we quote: moisture, level, movement and light.
Moisture · level · movementGrind, patch, prime and mask. Most of a great finish is preparation nobody sees.
Prep ≈ half the jobBy hand. Every bead, every coat, every pass of the trowel.
Hand-appliedWe work to the product’s cure times and the day’s weather, not to a rushed deadline.
Temp · humidity · timeA walk-through, a care guide, and we come back if anything is not right.
Care guide includedFAQ
It depends on floor area, the condition of the slab, crack repairs, and the system you choose: solid, flake, quartz or metallic. We give a free, fixed quote after a site inspection.
A well-prepared epoxy floor lasts many years. Life depends on traffic. Heavy-duty systems suit vehicles and equipment.
Yes. We screed to falls so water drains properly, then seal with a UV-stable topcoat. We check drains and upstands first.
A typical garage takes 2 to 3 days. We give exact walk-on and drive-on times in your quote.
Mainly concrete. The slab must be dry, so we moisture-test first. Old coatings are checked and removed if needed.
Start a project